Mikkeli Matlock c3865b318a docs(01-02): complete screen extraction plan
Tasks completed: 2/2
- SpeedometerScreen extracted to screens/speedometer_screen.dart (802 lines)
- OverlaySpeedometer extracted to screens/overlay_screen.dart (303 lines)
- main.dart slimmed to 39 lines (entry points only)

Phase 1 Foundation: COMPLETE (2/2 plans, 19.6 min total)

SUMMARY: .planning/phases/01-foundation/01-02-SUMMARY.md
2026-02-09 21:48:38 +09:00

100 lines
4.1 KiB
Markdown

# Project State
## Project Reference
See: .planning/PROJECT.md (updated 2026-02-09)
**Core value:** Reliable, lag-free GPS speed display that coexists politely with other Android apps
**Current focus:** Phase 1 - Foundation
## Current Position
Phase: 1 of 4 (Foundation)
Plan: 2 of 2 complete (01-02)
Status: Phase complete
Last activity: 2026-02-09 — Completed 01-02-PLAN.md
Progress: [██████████] 100% (Phase 1: 2/2 plans)
## Performance Metrics
**Velocity:**
- Total plans completed: 2
- Average duration: 9.8 minutes
- Total execution time: 0.33 hours
**By Phase:**
| Phase | Plans | Total | Avg/Plan |
|-------|-------|-------|----------|
| 1. Foundation | 2 | 19.6 min | 9.8 min |
**Recent Trend:**
- Last 5 plans: 01-01 (12.8 min), 01-02 (6.8 min)
- Trend: Accelerating (47% faster on plan 2)
*Updated after each plan completion*
## Accumulated Context
### Decisions
Decisions are logged in PROJECT.md Key Decisions table.
Recent decisions affecting current work:
| Phase | Plan | Decision | Status |
| ----- | ----- | ---------------------------------------------------- | -------------- |
| 01 | 01 | SCREAMING_SNAKE naming for behavioral constants | Implemented |
| 01 | 01 | Logger replaces print()/customDebugPrint() globally | Implemented |
| 01 | 01 | OverlayMessage typed class for IPC | Implemented |
| 01 | 01 | ThemeModel delegates to ColorThemes | Implemented |
| 01 | 01 | Layer-first directory structure | Implemented |
| 01 | 02 | SpeedometerScreen extracted to dedicated file | Implemented |
| 01 | 02 | OverlaySpeedometer extracted to dedicated file | Implemented |
| 01 | 02 | main.dart as pure entry point (39 lines) | Implemented |
| 02 | TBD | Provider pattern for state management | Pending |
| 04 | TBD | Speed-adaptive GPS precision (~10 km/h threshold) | Pending |
| 04 | TBD | Background GPS only when overlay visible | Pending |
| All | All | No new dependencies beyond provider package | In progress |
### Pending Todos
**Phase 1 Complete - Verification Needed:**
- [ ] Run full functionality test on physical Android device (non-blocking checkpoint from 01-02)
- [ ] Verify speed display, theme/unit cycling, overlay launch/close, landscape mode
- [ ] Confirm Logger output format in debug console
**Phase 2 Pre-work:**
- [ ] Create manual regression testing checklist before provider migration
- [ ] Audit 5+ async patterns in SpeedometerScreen for provider compatibility
- [ ] Design GpsDataManager singleton disposal strategy
### Blockers/Concerns
**Phase 1 (Complete):**
- RESOLVED: All structural requirements (ORG-01 through ORG-08) satisfied
- LOW: SCREAMING_SNAKE analyzer warnings (21 intentional info-level warnings) — Consider `analysis_options.yaml` exclusion if noise becomes issue
- LOW: Logger severity level guidelines should be documented for contributors
- INFO: Phase 1 functionality testing deferred to user-initiated session (non-blocking checkpoint)
**Phase 2 (Provider Migration):**
- HIGH RISK: Async lifecycle complexity — 5+ async patterns must be audited before migration
- Must create manual regression testing checklist before starting Phase 2
- GpsDataManager singleton disposal strategy needs design decision
**Phase 3 (Overlay Refactor):**
- MEDIUM RISK: flutter_overlay_window 0.5.0 has known communication issues
- May need testing on multiple Android versions for reliability
- Overlay status polling alternative needs research (event-based vs 5s polling)
**Phase 4 (GPS Optimization):**
- Speed thresholds (8/12 km/h) need field testing validation
- Android OEM behavior varies (Samsung, Xiaomi duty-cycling differences)
## Session Continuity
Last session: 2026-02-09 (plan 01-02 execution)
Stopped at: Completed 01-02-PLAN.md - Screen extraction (SpeedometerScreen, OverlaySpeedometer), main.dart slimmed to 39 lines
Resume file: None
Next action: Phase 1 complete - Ready for Phase 2 planning