- Create 01-01-SUMMARY.md: Comprehensive execution summary with 12.8 min duration - Update STATE.md: Progress 50% (1/2 plans complete), velocity metrics, decisions table - Document 5 key decisions made during execution - Record zero deviations, one minor bug (missing import) - Phase 1 ready to proceed with plan 01-02
87 lines
3.1 KiB
Markdown
87 lines
3.1 KiB
Markdown
# Project State
|
|
|
|
## Project Reference
|
|
|
|
See: .planning/PROJECT.md (updated 2026-02-09)
|
|
|
|
**Core value:** Reliable, lag-free GPS speed display that coexists politely with other Android apps
|
|
**Current focus:** Phase 1 - Foundation
|
|
|
|
## Current Position
|
|
|
|
Phase: 1 of 4 (Foundation)
|
|
Plan: 1 of 2 complete (01-01)
|
|
Status: In progress
|
|
Last activity: 2026-02-09 — Completed 01-01-PLAN.md
|
|
|
|
Progress: [█████░░░░░] 50% (Phase 1: 1/2 plans)
|
|
|
|
## Performance Metrics
|
|
|
|
**Velocity:**
|
|
- Total plans completed: 1
|
|
- Average duration: 12.8 minutes
|
|
- Total execution time: 0.21 hours
|
|
|
|
**By Phase:**
|
|
|
|
| Phase | Plans | Total | Avg/Plan |
|
|
|-------|-------|-------|----------|
|
|
| 1. Foundation | 1 | 12.8 min | 12.8 min |
|
|
|
|
**Recent Trend:**
|
|
- Last 5 plans: 01-01 (12.8 min)
|
|
- Trend: First plan completed
|
|
|
|
*Updated after each plan completion*
|
|
|
|
## Accumulated Context
|
|
|
|
### Decisions
|
|
|
|
Decisions are logged in PROJECT.md Key Decisions table.
|
|
Recent decisions affecting current work:
|
|
|
|
| Phase | Plan | Decision | Status |
|
|
| ----- | ----- | ---------------------------------------------------- | -------------- |
|
|
| 01 | 01 | SCREAMING_SNAKE naming for behavioral constants | Implemented |
|
|
| 01 | 01 | Logger replaces print()/customDebugPrint() globally | Implemented |
|
|
| 01 | 01 | OverlayMessage typed class for IPC | Implemented |
|
|
| 01 | 01 | ThemeModel delegates to ColorThemes | Implemented |
|
|
| 01 | 01 | Layer-first directory structure | Implemented |
|
|
| 02 | TBD | Provider pattern for state management | Pending |
|
|
| 04 | TBD | Speed-adaptive GPS precision (~10 km/h threshold) | Pending |
|
|
| 04 | TBD | Background GPS only when overlay visible | Pending |
|
|
| All | All | No new dependencies beyond provider package | In progress |
|
|
|
|
### Pending Todos
|
|
|
|
None yet.
|
|
|
|
### Blockers/Concerns
|
|
|
|
**Phase 1 (Current):**
|
|
- LOW: SCREAMING_SNAKE analyzer warnings (21 intentional info-level warnings) — Consider `analysis_options.yaml` exclusion if noise becomes issue
|
|
- LOW: Logger severity level guidelines should be documented for contributors
|
|
|
|
**Phase 2 (Provider Migration):**
|
|
- HIGH RISK: Async lifecycle complexity — 5+ async patterns must be audited before migration
|
|
- Must create manual regression testing checklist before starting Phase 2
|
|
- GpsDataManager singleton disposal strategy needs design decision
|
|
|
|
**Phase 3 (Overlay Refactor):**
|
|
- MEDIUM RISK: flutter_overlay_window 0.5.0 has known communication issues
|
|
- May need testing on multiple Android versions for reliability
|
|
- Overlay status polling alternative needs research (event-based vs 5s polling)
|
|
|
|
**Phase 4 (GPS Optimization):**
|
|
- Speed thresholds (8/12 km/h) need field testing validation
|
|
- Android OEM behavior varies (Samsung, Xiaomi duty-cycling differences)
|
|
|
|
## Session Continuity
|
|
|
|
Last session: 2026-02-09 (plan 01-01 execution)
|
|
Stopped at: Completed 01-01-PLAN.md - Infrastructure, Logger, Constants, Models extraction
|
|
Resume file: None
|
|
Next action: Execute 01-02-PLAN.md (Screen extraction)
|