Commit Graph

5 Commits

Author SHA1 Message Date
Mikkeli Matlock f4a2caeb65 docs: define v1 requirements
30 requirements across 6 categories
4 requirements deferred to v2
2026-02-09 19:36:03 +09:00
Mikkeli Matlock 3c4231d307 docs: complete project research
Files:
- STACK.md (recommended Provider + existing packages, no new dependencies)
- FEATURES.md (restructure patterns, MVVM architecture requirements)
- ARCHITECTURE.md (layer separation, overlay communication, data flow)
- PITFALLS.md (async lifecycle issues, GPS leaks, battery drain)
- SUMMARY.md (synthesis with 4-phase roadmap recommendations)

Key findings:
- Stack: Provider 6.1.x + existing geolocator/overlay packages (no additions needed)
- Architecture: MVVM with layer-first structure, isolate-aware overlay messaging
- Critical pitfall: setState after dispose during Provider migration (audit async patterns first)

Overall confidence: HIGH
Estimated effort: 52-70 hours
Highest risk: Phase 2 (Provider migration) and Phase 3 (Overlay refactor)

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-09 19:28:28 +09:00
Mikkeli Matlock 308b2c549f chore: add project config
Mode: yolo
Depth: quick
Parallelization: enabled
Workflow agents: research=on, plan_check=on, verifier=on
2026-02-09 19:16:23 +09:00
Mikkeli Matlock 64d210af5c docs: initialize project
Restructure GPS speedometer: modular architecture, Provider state management, overlay reliability fixes, speed-adaptive GPS precision, cooperative Android GPS access.
2026-02-09 19:14:32 +09:00
Mikkeli Matlock a686e6b0fb docs: map existing codebase
- STACK.md - Technologies and dependencies
- ARCHITECTURE.md - System design and patterns
- STRUCTURE.md - Directory layout
- CONVENTIONS.md - Code style and patterns
- TESTING.md - Test structure
- INTEGRATIONS.md - External services
- CONCERNS.md - Technical debt and issues
2026-02-09 18:51:11 +09:00