Commit Graph

16 Commits

Author SHA1 Message Date
Mikkeli Matlock 8ff74b36e1 docs(02): research phase domain
Phase 02: Provider Migration
- Standard stack identified (provider v6.1.5+1)
- Architecture patterns documented (ChangeNotifier, Consumer, Selector)
- Pitfalls catalogued (7 common errors with solutions)
- Migration strategy validated against context decisions

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-10 11:05:17 +09:00
Mikkeli Matlock 919b239c6e docs(02): capture phase context
Phase 02: Provider Migration
- Implementation decisions documented
- Phase boundary established
2026-02-10 10:58:15 +09:00
Mikkeli Matlock 5c9f3d225e wip: foundation complete, paused before phase 2
Phase 1 fully executed and verified (9/9 must-haves).
Ready to resume with Phase 2 (Provider Migration).

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-09 21:58:56 +09:00
Mikkeli Matlock 8e3ad7f00c docs(01): complete foundation phase
Phase 1: Foundation - 2 plans executed in 19.6 minutes
- 01-01: Infrastructure, Logger, Constants, Models (12.8 min)
- 01-02: Screen extraction (6.8 min)
- Verification: 9/9 must-haves passed
- Requirements ORG-01 through ORG-08 marked Complete

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-09 21:55:01 +09:00
Mikkeli Matlock c3865b318a docs(01-02): complete screen extraction plan
Tasks completed: 2/2
- SpeedometerScreen extracted to screens/speedometer_screen.dart (802 lines)
- OverlaySpeedometer extracted to screens/overlay_screen.dart (303 lines)
- main.dart slimmed to 39 lines (entry points only)

Phase 1 Foundation: COMPLETE (2/2 plans, 19.6 min total)

SUMMARY: .planning/phases/01-foundation/01-02-SUMMARY.md
2026-02-09 21:48:38 +09:00
Mikkeli Matlock 88293716a4 docs(01-01): complete plan execution with summary and state updates
- Create 01-01-SUMMARY.md: Comprehensive execution summary with 12.8 min duration
- Update STATE.md: Progress 50% (1/2 plans complete), velocity metrics, decisions table
- Document 5 key decisions made during execution
- Record zero deviations, one minor bug (missing import)
- Phase 1 ready to proceed with plan 01-02
2026-02-09 21:37:02 +09:00
Mikkeli Matlock 7e9ed22e40 fix(01): revise plans based on checker feedback
- Clarified ThemeModel delegation rationale (Issue 1)
- Documented why Task 3 is one atomic task (Issue 2)
- Made customDebugPrint deletion step unambiguous (Issue 3)

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-09 21:13:09 +09:00
Mikkeli Matlock 7f8075b76d docs(01): create phase plan
Phase 01: Foundation
- 2 plan(s) in 2 wave(s)
- 2 autonomous, 0 checkpoint-only
- Ready for execution

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-09 21:08:34 +09:00
Mikkeli Matlock c3b38c25a2 docs(01): research phase domain
Phase 01: Foundation
- Standard stack identified
- Architecture patterns documented
- Pitfalls catalogued

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-09 21:02:20 +09:00
Mikkeli Matlock d41e29a1b9 docs(01): capture phase context
Phase 01: Foundation
- Implementation decisions documented
- Phase boundary established

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-09 20:54:59 +09:00
Mikkeli Matlock 92f3f83a9c docs: create roadmap (4 phases)
Phases:
1. Foundation: code organization, model extraction (ORG-01–08)
2. Provider migration: setState → ChangeNotifier/Consumer (STATE-01–07)
3. Overlay refactor: fix data staleness, error surfacing (OVRL-01–06)
4. GPS & power: adaptive precision, lifecycle management (GPS-01–04, PWR-01–06)

All v1 requirements mapped to phases.
2026-02-09 20:35:40 +09:00
Mikkeli Matlock f4a2caeb65 docs: define v1 requirements
30 requirements across 6 categories
4 requirements deferred to v2
2026-02-09 19:36:03 +09:00
Mikkeli Matlock 3c4231d307 docs: complete project research
Files:
- STACK.md (recommended Provider + existing packages, no new dependencies)
- FEATURES.md (restructure patterns, MVVM architecture requirements)
- ARCHITECTURE.md (layer separation, overlay communication, data flow)
- PITFALLS.md (async lifecycle issues, GPS leaks, battery drain)
- SUMMARY.md (synthesis with 4-phase roadmap recommendations)

Key findings:
- Stack: Provider 6.1.x + existing geolocator/overlay packages (no additions needed)
- Architecture: MVVM with layer-first structure, isolate-aware overlay messaging
- Critical pitfall: setState after dispose during Provider migration (audit async patterns first)

Overall confidence: HIGH
Estimated effort: 52-70 hours
Highest risk: Phase 2 (Provider migration) and Phase 3 (Overlay refactor)

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-09 19:28:28 +09:00
Mikkeli Matlock 308b2c549f chore: add project config
Mode: yolo
Depth: quick
Parallelization: enabled
Workflow agents: research=on, plan_check=on, verifier=on
2026-02-09 19:16:23 +09:00
Mikkeli Matlock 64d210af5c docs: initialize project
Restructure GPS speedometer: modular architecture, Provider state management, overlay reliability fixes, speed-adaptive GPS precision, cooperative Android GPS access.
2026-02-09 19:14:32 +09:00
Mikkeli Matlock a686e6b0fb docs: map existing codebase
- STACK.md - Technologies and dependencies
- ARCHITECTURE.md - System design and patterns
- STRUCTURE.md - Directory layout
- CONVENTIONS.md - Code style and patterns
- TESTING.md - Test structure
- INTEGRATIONS.md - External services
- CONCERNS.md - Technical debt and issues
2026-02-09 18:51:11 +09:00