Mikkeli Matlock
7f8075b76d
docs(01): create phase plan
...
Phase 01: Foundation
- 2 plan(s) in 2 wave(s)
- 2 autonomous, 0 checkpoint-only
- Ready for execution
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com >
2026-02-09 21:08:34 +09:00
Mikkeli Matlock
c3b38c25a2
docs(01): research phase domain
...
Phase 01: Foundation
- Standard stack identified
- Architecture patterns documented
- Pitfalls catalogued
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com >
2026-02-09 21:02:20 +09:00
Mikkeli Matlock
d41e29a1b9
docs(01): capture phase context
...
Phase 01: Foundation
- Implementation decisions documented
- Phase boundary established
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com >
2026-02-09 20:54:59 +09:00
Mikkeli Matlock
92f3f83a9c
docs: create roadmap (4 phases)
...
Phases:
1. Foundation: code organization, model extraction (ORG-01–08)
2. Provider migration: setState → ChangeNotifier/Consumer (STATE-01–07)
3. Overlay refactor: fix data staleness, error surfacing (OVRL-01–06)
4. GPS & power: adaptive precision, lifecycle management (GPS-01–04, PWR-01–06)
All v1 requirements mapped to phases.
2026-02-09 20:35:40 +09:00
Mikkeli Matlock
f4a2caeb65
docs: define v1 requirements
...
30 requirements across 6 categories
4 requirements deferred to v2
2026-02-09 19:36:03 +09:00
Mikkeli Matlock
3c4231d307
docs: complete project research
...
Files:
- STACK.md (recommended Provider + existing packages, no new dependencies)
- FEATURES.md (restructure patterns, MVVM architecture requirements)
- ARCHITECTURE.md (layer separation, overlay communication, data flow)
- PITFALLS.md (async lifecycle issues, GPS leaks, battery drain)
- SUMMARY.md (synthesis with 4-phase roadmap recommendations)
Key findings:
- Stack: Provider 6.1.x + existing geolocator/overlay packages (no additions needed)
- Architecture: MVVM with layer-first structure, isolate-aware overlay messaging
- Critical pitfall: setState after dispose during Provider migration (audit async patterns first)
Overall confidence: HIGH
Estimated effort: 52-70 hours
Highest risk: Phase 2 (Provider migration) and Phase 3 (Overlay refactor)
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com >
2026-02-09 19:28:28 +09:00
Mikkeli Matlock
308b2c549f
chore: add project config
...
Mode: yolo
Depth: quick
Parallelization: enabled
Workflow agents: research=on, plan_check=on, verifier=on
2026-02-09 19:16:23 +09:00
Mikkeli Matlock
64d210af5c
docs: initialize project
...
Restructure GPS speedometer: modular architecture, Provider state management, overlay reliability fixes, speed-adaptive GPS precision, cooperative Android GPS access.
2026-02-09 19:14:32 +09:00
Mikkeli Matlock
a686e6b0fb
docs: map existing codebase
...
- STACK.md - Technologies and dependencies
- ARCHITECTURE.md - System design and patterns
- STRUCTURE.md - Directory layout
- CONVENTIONS.md - Code style and patterns
- TESTING.md - Test structure
- INTEGRATIONS.md - External services
- CONCERNS.md - Technical debt and issues
2026-02-09 18:51:11 +09:00