Commit Graph

1 Commits

Author SHA1 Message Date
Mikkeli Matlock 40c74677be docs(04): create phase plan for GPS & power optimization
2 plans in 2 waves: core GPS engine (precision switching, lifecycle,
wake lock) then UI integration (main app staleness, screen cleanup,
provider wiring).

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-12 08:50:46 +09:00