10 Commits

Author SHA1 Message Date
Mikkeli Matlock 26cdf24874 docs(04): complete phase 4 verification and roadmap
Mark Phase 4 complete in ROADMAP.md, add VERIFICATION.md (6/6
automated checks passed), and update phase 02 continue-here artifact.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-02-18 07:52:38 +09:00
Mikkeli Matlock 40c74677be docs(04): create phase plan for GPS & power optimization
2 plans in 2 waves: core GPS engine (precision switching, lifecycle,
wake lock) then UI integration (main app staleness, screen cleanup,
provider wiring).

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-12 08:50:46 +09:00
Mikkeli Matlock d0427219a2 docs(03): complete overlay refactor phase
Phase 3 verified: 9/9 must-haves, 6/6 OVRL requirements satisfied.
OverlayService wrapper, staleness detection, error surfacing all verified.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-11 19:35:15 +09:00
Mikkeli Matlock c58183b4fb docs(03): create phase plan for overlay refactor
Phase 3: Overlay Refactor
- 2 plan(s) in 2 wave(s)
- Sequential execution (Plan 02 depends on Plan 01)
- Ready for execution

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-11 19:00:39 +09:00
Mikkeli Matlock 09c80011b8 docs(02-02): complete MultiProvider wiring and screen migration plan
Tasks completed: 2/2
- Task 1: Wire MultiProvider in main.dart with async SharedPreferences
- Task 2: Migrate SpeedometerScreen from setState to Provider

SUMMARY: .planning/phases/02-provider-migration/02-02-SUMMARY.md
2026-02-10 22:21:04 +09:00
Mikkeli Matlock 3c5ce89ded docs(02-01): complete provider infrastructure plan
Tasks completed: 3/3
- Task 1: Add provider dependencies and refactor GpsDataManager to ChangeNotifier
- Task 2: Create SettingsProvider for theme and unit state
- Task 3: Create OverlayProvider for overlay lifecycle and messaging

SUMMARY: .planning/phases/02-provider-migration/02-01-SUMMARY.md
2026-02-10 22:11:49 +09:00
Mikkeli Matlock 630cf1c578 docs(02): create phase plan
Phase 02: Provider Migration
- 2 plan(s) in 2 wave(s)
- Wave 1: Create providers (GpsDataManager + SettingsProvider + OverlayProvider)
- Wave 2: Wire MultiProvider and migrate SpeedometerScreen
- Ready for execution
2026-02-10 11:13:29 +09:00
Mikkeli Matlock c3865b318a docs(01-02): complete screen extraction plan
Tasks completed: 2/2
- SpeedometerScreen extracted to screens/speedometer_screen.dart (802 lines)
- OverlaySpeedometer extracted to screens/overlay_screen.dart (303 lines)
- main.dart slimmed to 39 lines (entry points only)

Phase 1 Foundation: COMPLETE (2/2 plans, 19.6 min total)

SUMMARY: .planning/phases/01-foundation/01-02-SUMMARY.md
2026-02-09 21:48:38 +09:00
Mikkeli Matlock 7f8075b76d docs(01): create phase plan
Phase 01: Foundation
- 2 plan(s) in 2 wave(s)
- 2 autonomous, 0 checkpoint-only
- Ready for execution

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-09 21:08:34 +09:00
Mikkeli Matlock 92f3f83a9c docs: create roadmap (4 phases)
Phases:
1. Foundation: code organization, model extraction (ORG-01–08)
2. Provider migration: setState → ChangeNotifier/Consumer (STATE-01–07)
3. Overlay refactor: fix data staleness, error surfacing (OVRL-01–06)
4. GPS & power: adaptive precision, lifecycle management (GPS-01–04, PWR-01–06)

All v1 requirements mapped to phases.
2026-02-09 20:35:40 +09:00