docs(01-02): complete screen extraction plan
Tasks completed: 2/2 - SpeedometerScreen extracted to screens/speedometer_screen.dart (802 lines) - OverlaySpeedometer extracted to screens/overlay_screen.dart (303 lines) - main.dart slimmed to 39 lines (entry points only) Phase 1 Foundation: COMPLETE (2/2 plans, 19.6 min total) SUMMARY: .planning/phases/01-foundation/01-02-SUMMARY.md
This commit is contained in:
+28
-15
@@ -10,28 +10,28 @@ See: .planning/PROJECT.md (updated 2026-02-09)
|
||||
## Current Position
|
||||
|
||||
Phase: 1 of 4 (Foundation)
|
||||
Plan: 1 of 2 complete (01-01)
|
||||
Status: In progress
|
||||
Last activity: 2026-02-09 — Completed 01-01-PLAN.md
|
||||
Plan: 2 of 2 complete (01-02)
|
||||
Status: Phase complete
|
||||
Last activity: 2026-02-09 — Completed 01-02-PLAN.md
|
||||
|
||||
Progress: [█████░░░░░] 50% (Phase 1: 1/2 plans)
|
||||
Progress: [██████████] 100% (Phase 1: 2/2 plans)
|
||||
|
||||
## Performance Metrics
|
||||
|
||||
**Velocity:**
|
||||
- Total plans completed: 1
|
||||
- Average duration: 12.8 minutes
|
||||
- Total execution time: 0.21 hours
|
||||
- Total plans completed: 2
|
||||
- Average duration: 9.8 minutes
|
||||
- Total execution time: 0.33 hours
|
||||
|
||||
**By Phase:**
|
||||
|
||||
| Phase | Plans | Total | Avg/Plan |
|
||||
|-------|-------|-------|----------|
|
||||
| 1. Foundation | 1 | 12.8 min | 12.8 min |
|
||||
| 1. Foundation | 2 | 19.6 min | 9.8 min |
|
||||
|
||||
**Recent Trend:**
|
||||
- Last 5 plans: 01-01 (12.8 min)
|
||||
- Trend: First plan completed
|
||||
- Last 5 plans: 01-01 (12.8 min), 01-02 (6.8 min)
|
||||
- Trend: Accelerating (47% faster on plan 2)
|
||||
|
||||
*Updated after each plan completion*
|
||||
|
||||
@@ -49,6 +49,9 @@ Recent decisions affecting current work:
|
||||
| 01 | 01 | OverlayMessage typed class for IPC | Implemented |
|
||||
| 01 | 01 | ThemeModel delegates to ColorThemes | Implemented |
|
||||
| 01 | 01 | Layer-first directory structure | Implemented |
|
||||
| 01 | 02 | SpeedometerScreen extracted to dedicated file | Implemented |
|
||||
| 01 | 02 | OverlaySpeedometer extracted to dedicated file | Implemented |
|
||||
| 01 | 02 | main.dart as pure entry point (39 lines) | Implemented |
|
||||
| 02 | TBD | Provider pattern for state management | Pending |
|
||||
| 04 | TBD | Speed-adaptive GPS precision (~10 km/h threshold) | Pending |
|
||||
| 04 | TBD | Background GPS only when overlay visible | Pending |
|
||||
@@ -56,13 +59,23 @@ Recent decisions affecting current work:
|
||||
|
||||
### Pending Todos
|
||||
|
||||
None yet.
|
||||
**Phase 1 Complete - Verification Needed:**
|
||||
- [ ] Run full functionality test on physical Android device (non-blocking checkpoint from 01-02)
|
||||
- [ ] Verify speed display, theme/unit cycling, overlay launch/close, landscape mode
|
||||
- [ ] Confirm Logger output format in debug console
|
||||
|
||||
**Phase 2 Pre-work:**
|
||||
- [ ] Create manual regression testing checklist before provider migration
|
||||
- [ ] Audit 5+ async patterns in SpeedometerScreen for provider compatibility
|
||||
- [ ] Design GpsDataManager singleton disposal strategy
|
||||
|
||||
### Blockers/Concerns
|
||||
|
||||
**Phase 1 (Current):**
|
||||
**Phase 1 (Complete):**
|
||||
- RESOLVED: All structural requirements (ORG-01 through ORG-08) satisfied
|
||||
- LOW: SCREAMING_SNAKE analyzer warnings (21 intentional info-level warnings) — Consider `analysis_options.yaml` exclusion if noise becomes issue
|
||||
- LOW: Logger severity level guidelines should be documented for contributors
|
||||
- INFO: Phase 1 functionality testing deferred to user-initiated session (non-blocking checkpoint)
|
||||
|
||||
**Phase 2 (Provider Migration):**
|
||||
- HIGH RISK: Async lifecycle complexity — 5+ async patterns must be audited before migration
|
||||
@@ -80,7 +93,7 @@ None yet.
|
||||
|
||||
## Session Continuity
|
||||
|
||||
Last session: 2026-02-09 (plan 01-01 execution)
|
||||
Stopped at: Completed 01-01-PLAN.md - Infrastructure, Logger, Constants, Models extraction
|
||||
Last session: 2026-02-09 (plan 01-02 execution)
|
||||
Stopped at: Completed 01-02-PLAN.md - Screen extraction (SpeedometerScreen, OverlaySpeedometer), main.dart slimmed to 39 lines
|
||||
Resume file: None
|
||||
Next action: Execute 01-02-PLAN.md (Screen extraction)
|
||||
Next action: Phase 1 complete - Ready for Phase 2 planning
|
||||
|
||||
Reference in New Issue
Block a user