docs(04-01): complete core GPS engine plan
- Created SUMMARY.md documenting lifecycle-aware GPS engine implementation - Updated STATE.md to Phase 4 Plan 1 of 2 complete (70% progress) - Added 6 key decisions to STATE.md decisions table - Updated performance metrics: 7 plans, 4.9 min average for Phase 4 - Updated session continuity and blockers sections - Documented self-check results: all files and commits verified Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
This commit is contained in:
+30
-18
@@ -9,19 +9,19 @@ See: .planning/PROJECT.md (updated 2026-02-09)
|
||||
|
||||
## Current Position
|
||||
|
||||
Phase: 3 of 4 (Overlay Refactor)
|
||||
Plan: 2 of 2 complete
|
||||
Status: Phase complete
|
||||
Last activity: 2026-02-11 — Completed 03-02-PLAN.md
|
||||
Phase: 4 of 4 (GPS Power Optimization)
|
||||
Plan: 1 of 2 complete
|
||||
Status: In progress
|
||||
Last activity: 2026-02-12 — Completed 04-01-PLAN.md
|
||||
|
||||
Progress: [██████░░░░] 60% (Phase 3: 2/2 plans complete)
|
||||
Progress: [███████░░░] 70% (Phase 4: 1/2 plans complete)
|
||||
|
||||
## Performance Metrics
|
||||
|
||||
**Velocity:**
|
||||
- Total plans completed: 6
|
||||
- Average duration: 6.3 minutes
|
||||
- Total execution time: 0.63 hours
|
||||
- Total plans completed: 7
|
||||
- Average duration: 6.0 minutes
|
||||
- Total execution time: 0.71 hours
|
||||
|
||||
**By Phase:**
|
||||
|
||||
@@ -30,10 +30,11 @@ Progress: [██████░░░░] 60% (Phase 3: 2/2 plans complete)
|
||||
| 1. Foundation | 2 | 19.6 min | 9.8 min |
|
||||
| 2. Provider Migration | 2 | 11.5 min | 5.75 min |
|
||||
| 3. Overlay Refactor | 2 | 8.25 min | 4.1 min |
|
||||
| 4. GPS Optimization | 1 | 4.9 min | 4.9 min |
|
||||
|
||||
**Recent Trend:**
|
||||
- Last 5 plans: 02-01 (7.7 min), 02-02 (3.8 min), 03-01 (4.0 min), 03-02 (4.25 min)
|
||||
- Trend: Consistent sub-5-minute plans in Phase 3
|
||||
- Last 5 plans: 02-02 (3.8 min), 03-01 (4.0 min), 03-02 (4.25 min), 04-01 (4.9 min)
|
||||
- Trend: Consistent sub-5-minute plans continuing in Phase 4
|
||||
|
||||
*Updated after each plan completion*
|
||||
|
||||
@@ -70,8 +71,12 @@ Recent decisions affecting current work:
|
||||
| 03 | 02 | Error callback pattern for provider-to-screen comm | Implemented |
|
||||
| 03 | 02 | Staleness opacity via withValues(alpha:) no animation | Implemented |
|
||||
| 03 | 02 | GPS grace period timer created (Phase 4 lifecycle) | Implemented |
|
||||
| 04 | TBD | Speed-adaptive GPS precision (~10 km/h threshold) | Pending |
|
||||
| 04 | TBD | Background GPS only when overlay visible | Pending |
|
||||
| 04 | 01 | Speed-adaptive GPS precision (8/12 km/h hysteresis) | Implemented |
|
||||
| 04 | 01 | Precision switching gated until 5s after first fix | Implemented |
|
||||
| 04 | 01 | Background grace period re-checks overlay at expiry | Implemented |
|
||||
| 04 | 01 | Wake lock contextual: GPS + (overlay OR foreground) | Implemented |
|
||||
| 04 | 01 | GPS stop preserves last data for staleness display | Implemented |
|
||||
| 04 | 01 | BACKGROUND_GRACE_PERIOD (7s) replaces GPS_GRACE_PERIOD| Implemented |
|
||||
|
||||
### Pending Todos
|
||||
|
||||
@@ -125,13 +130,20 @@ Recent decisions affecting current work:
|
||||
- INFO: Manual testing needed to verify overlay reliability improvements on physical device
|
||||
- INFO: All OVRL-01 through OVRL-06 requirements satisfied
|
||||
|
||||
**Phase 4 (GPS Optimization):**
|
||||
- Speed thresholds (8/12 km/h) need field testing validation
|
||||
- Android OEM behavior varies (Samsung, Xiaomi duty-cycling differences)
|
||||
**Phase 4 (GPS Optimization) - In Progress:**
|
||||
- RESOLVED: Core GPS engine complete with lifecycle awareness and precision switching
|
||||
- RESOLVED: ProcessedGpsData timestamp field added for staleness detection
|
||||
- RESOLVED: Background grace period (7s) with race condition protection
|
||||
- RESOLVED: Conditional wake lock (GPS active + visible)
|
||||
- INFO: Plan 04-01 complete (4.9 min) — ready for Plan 04-02 (UI Integration)
|
||||
- PENDING: SpeedometerScreen needs gpsDataManager.setOverlayProvider() call
|
||||
- PENDING: Background heartbeat (5s) may need adjustment vs 7s grace period
|
||||
- FIELD TESTING: Speed thresholds (8/12 km/h) need validation on physical device
|
||||
- FIELD TESTING: Android OEM behavior varies (Samsung, Xiaomi duty-cycling differences)
|
||||
|
||||
## Session Continuity
|
||||
|
||||
Last session: 2026-02-11 (Plan 03-02 execution complete)
|
||||
Stopped at: Completed 03-02-PLAN.md — Phase 3 complete
|
||||
Last session: 2026-02-12 (Plan 04-01 execution complete)
|
||||
Stopped at: Completed 04-01-PLAN.md — Phase 4 in progress (1/2 plans)
|
||||
Resume file: None
|
||||
Next action: Begin Phase 4 (GPS Optimization) planning
|
||||
Next action: Execute Plan 04-02 (UI Integration)
|
||||
|
||||