docs(04-02): complete UI integration plan

- Created 04-02-SUMMARY.md with execution details
- Updated STATE.md progress (Phase 4: 2/2 complete)
- Updated performance metrics (8 plans, 5.5 min avg)
- Added key decisions to accumulated context
- Marked Phase 4 as complete
This commit is contained in:
Mikkeli Matlock
2026-02-12 09:12:43 +09:00
parent 75d58c08ed
commit 177e13a2f8
2 changed files with 207 additions and 17 deletions
+24 -17
View File
@@ -10,18 +10,18 @@ See: .planning/PROJECT.md (updated 2026-02-09)
## Current Position
Phase: 4 of 4 (GPS Power Optimization)
Plan: 1 of 2 complete
Status: In progress
Last activity: 2026-02-12 — Completed 04-01-PLAN.md
Plan: 2 of 2 complete
Status: Complete
Last activity: 2026-02-12 — Completed 04-02-PLAN.md
Progress: [███████░░░] 70% (Phase 4: 1/2 plans complete)
Progress: [██████████] 100% (Phase 4: 2/2 plans complete)
## Performance Metrics
**Velocity:**
- Total plans completed: 7
- Average duration: 6.0 minutes
- Total execution time: 0.71 hours
- Total plans completed: 8
- Average duration: 5.5 minutes
- Total execution time: 0.77 hours
**By Phase:**
@@ -30,11 +30,11 @@ Progress: [███████░░░] 70% (Phase 4: 1/2 plans complete)
| 1. Foundation | 2 | 19.6 min | 9.8 min |
| 2. Provider Migration | 2 | 11.5 min | 5.75 min |
| 3. Overlay Refactor | 2 | 8.25 min | 4.1 min |
| 4. GPS Optimization | 1 | 4.9 min | 4.9 min |
| 4. GPS Optimization | 2 | 8.25 min | 4.1 min |
**Recent Trend:**
- Last 5 plans: 02-02 (3.8 min), 03-01 (4.0 min), 03-02 (4.25 min), 04-01 (4.9 min)
- Trend: Consistent sub-5-minute plans continuing in Phase 4
- Last 5 plans: 03-01 (4.0 min), 03-02 (4.25 min), 04-01 (4.9 min), 04-02 (3.35 min)
- Trend: Consistent sub-5-minute plans, Phase 4 completed efficiently
*Updated after each plan completion*
@@ -77,6 +77,10 @@ Recent decisions affecting current work:
| 04 | 01 | Wake lock contextual: GPS + (overlay OR foreground) | Implemented |
| 04 | 01 | GPS stop preserves last data for staleness display | Implemented |
| 04 | 01 | BACKGROUND_GRACE_PERIOD (7s) replaces GPS_GRACE_PERIOD| Implemented |
| 04 | 02 | Staleness detection uses same thresholds as overlay | Implemented |
| 04 | 02 | Background heartbeat checks only overlay state | Implemented |
| 04 | 02 | Haptic feedback added to theme/unit cycling | Implemented |
| 04 | 02 | GPS_GRACE_PERIOD kept as deprecated (unused) | Implemented |
### Pending Todos
@@ -130,20 +134,23 @@ Recent decisions affecting current work:
- INFO: Manual testing needed to verify overlay reliability improvements on physical device
- INFO: All OVRL-01 through OVRL-06 requirements satisfied
**Phase 4 (GPS Optimization) - In Progress:**
**Phase 4 (GPS Optimization) - Complete:**
- RESOLVED: Core GPS engine complete with lifecycle awareness and precision switching
- RESOLVED: ProcessedGpsData timestamp field added for staleness detection
- RESOLVED: Background grace period (7s) with race condition protection
- RESOLVED: Conditional wake lock (GPS active + visible)
- INFO: Plan 04-01 complete (4.9 min) — ready for Plan 04-02 (UI Integration)
- PENDING: SpeedometerScreen needs gpsDataManager.setOverlayProvider() call
- PENDING: Background heartbeat (5s) may need adjustment vs 7s grace period
- RESOLVED: Plan 04-01 complete (4.9 min) — Core GPS engine with lifecycle
- RESOLVED: Plan 04-02 complete (3.35 min) — UI integration with staleness detection
- RESOLVED: SpeedometerScreen staleness detection added (3s dim, 10s dash)
- RESOLVED: Wake lock and lifecycle centralized in GpsDataManager
- RESOLVED: OverlayProvider grace period placeholder removed
- FIELD TESTING: Speed thresholds (8/12 km/h) need validation on physical device
- FIELD TESTING: Staleness behavior (3s/10s) needs verification during signal loss
- FIELD TESTING: Android OEM behavior varies (Samsung, Xiaomi duty-cycling differences)
## Session Continuity
Last session: 2026-02-12 (Plan 04-01 execution complete)
Stopped at: Completed 04-01-PLAN.md — Phase 4 in progress (1/2 plans)
Last session: 2026-02-12 (Plan 04-02 execution complete)
Stopped at: Completed 04-02-PLAN.md — Phase 4 complete (2/2 plans)
Resume file: None
Next action: Execute Plan 04-02 (UI Integration)
Next action: All phases complete — ready for integration testing and field validation