docs(03-02): complete overlay integration plan
Tasks completed: 2/2 - Task 1: Integrated OverlayService into OverlayProvider with error callbacks and GPS grace period - Task 2: Added staleness detection to overlay screen and error surfacing to SpeedometerScreen SUMMARY: .planning/phases/03-overlay-refactor/03-02-SUMMARY.md
This commit is contained in:
+35
-24
@@ -5,23 +5,23 @@
|
||||
See: .planning/PROJECT.md (updated 2026-02-09)
|
||||
|
||||
**Core value:** Reliable, lag-free GPS speed display that coexists politely with other Android apps
|
||||
**Current focus:** Phase 3 - Overlay Refactor (IN PROGRESS)
|
||||
**Current focus:** Phase 4 - GPS Optimization
|
||||
|
||||
## Current Position
|
||||
|
||||
Phase: 3 of 4 (Overlay Refactor)
|
||||
Plan: 1 of 2 complete
|
||||
Status: In progress
|
||||
Last activity: 2026-02-11 — Completed 03-01-PLAN.md
|
||||
Plan: 2 of 2 complete
|
||||
Status: Phase complete
|
||||
Last activity: 2026-02-11 — Completed 03-02-PLAN.md
|
||||
|
||||
Progress: [████░░░░░░] 55% (Phase 3: 1/2 plans)
|
||||
Progress: [██████░░░░] 60% (Phase 3: 2/2 plans complete)
|
||||
|
||||
## Performance Metrics
|
||||
|
||||
**Velocity:**
|
||||
- Total plans completed: 5
|
||||
- Average duration: 6.9 minutes
|
||||
- Total execution time: 0.58 hours
|
||||
- Total plans completed: 6
|
||||
- Average duration: 6.3 minutes
|
||||
- Total execution time: 0.63 hours
|
||||
|
||||
**By Phase:**
|
||||
|
||||
@@ -29,11 +29,11 @@ Progress: [████░░░░░░] 55% (Phase 3: 1/2 plans)
|
||||
|-------|-------|-------|----------|
|
||||
| 1. Foundation | 2 | 19.6 min | 9.8 min |
|
||||
| 2. Provider Migration | 2 | 11.5 min | 5.75 min |
|
||||
| 3. Overlay Refactor | 1 | 4.0 min | 4.0 min |
|
||||
| 3. Overlay Refactor | 2 | 8.25 min | 4.1 min |
|
||||
|
||||
**Recent Trend:**
|
||||
- Last 5 plans: 01-02 (6.8 min), 02-01 (7.7 min), 02-02 (3.8 min), 03-01 (4.0 min)
|
||||
- Trend: Continuing acceleration (4.0 min on latest plan)
|
||||
- Last 5 plans: 02-01 (7.7 min), 02-02 (3.8 min), 03-01 (4.0 min), 03-02 (4.25 min)
|
||||
- Trend: Consistent sub-5-minute plans in Phase 3
|
||||
|
||||
*Updated after each plan completion*
|
||||
|
||||
@@ -66,6 +66,10 @@ Recent decisions affecting current work:
|
||||
| 03 | 01 | shareData fire-and-forget (no retry, warn logging) | Implemented |
|
||||
| 03 | 01 | Staleness thresholds: 3s dim, 10s dash | Implemented |
|
||||
| 03 | 01 | Timestamp auto-populated in OverlayMessage factories | Implemented |
|
||||
| 03 | 02 | OverlayProvider delegates ALL calls to OverlayService | Implemented |
|
||||
| 03 | 02 | Error callback pattern for provider-to-screen comm | Implemented |
|
||||
| 03 | 02 | Staleness opacity via withValues(alpha:) no animation | Implemented |
|
||||
| 03 | 02 | GPS grace period timer created (Phase 4 lifecycle) | Implemented |
|
||||
| 04 | TBD | Speed-adaptive GPS precision (~10 km/h threshold) | Pending |
|
||||
| 04 | TBD | Background GPS only when overlay visible | Pending |
|
||||
|
||||
@@ -84,12 +88,17 @@ Recent decisions affecting current work:
|
||||
- [ ] Manual testing: Settings persistence, theme/unit cycling, overlay toggle, background heartbeat
|
||||
- [ ] Manual testing: Verify no "setState after dispose" or "ChangeNotifier after dispose" errors
|
||||
|
||||
**Phase 3 In Progress:**
|
||||
**Phase 3 Complete:**
|
||||
- [x] 03-01 complete — Overlay foundation infrastructure (4.0 min)
|
||||
- [x] OverlayService wrapper with retry logic created
|
||||
- [x] OverlayMessage enhanced with timestamp tracking
|
||||
- [x] Staleness constants and GPS grace period defined
|
||||
- [ ] 03-02 next — Integrate OverlayService and staleness detection
|
||||
- [x] 03-02 complete — Overlay integration with staleness detection (4.25 min)
|
||||
- [x] OverlayProvider delegates all platform calls to OverlayService
|
||||
- [x] Permission checks before overlay creation, verified creation via isActive()
|
||||
- [x] Staleness detection: dim at 3s, dashes at 10s, immediate snap-back
|
||||
- [x] Error surfacing via snackbar with Settings action for permission errors
|
||||
- [x] GPS grace period timer (30s) infrastructure for Phase 4
|
||||
- [ ] Manual testing: Verify overlay reliability improvements on physical device
|
||||
- [ ] Manual testing: Test permission error snackbar and Settings action button
|
||||
- [ ] Manual testing: Verify staleness dimming and dash display timing
|
||||
|
||||
### Blockers/Concerns
|
||||
|
||||
@@ -106,13 +115,15 @@ Recent decisions affecting current work:
|
||||
- RESOLVED: Zero setState calls for shared state (theme, unit, GPS data, overlay status)
|
||||
- INFO: Manual testing needed to verify settings persistence and provider lifecycle
|
||||
|
||||
**Phase 3 (Overlay Refactor) — In Progress:**
|
||||
**Phase 3 (Overlay Refactor) — Complete:**
|
||||
- RESOLVED: OverlayService foundation complete with retry logic
|
||||
- RESOLVED: Timestamp tracking in OverlayMessage for staleness detection
|
||||
- RESOLVED: Staleness constants defined (3s dim, 10s dash, 30s GPS grace)
|
||||
- RESOLVED: OverlayProvider integration complete with permission checks and verified creation
|
||||
- RESOLVED: Staleness detection complete (3s dim, 10s dash, immediate snap-back)
|
||||
- RESOLVED: Error surfacing complete (snackbar with Settings action for permission errors)
|
||||
- RESOLVED: GPS grace period timer infrastructure created for Phase 4
|
||||
- MEDIUM RISK: flutter_overlay_window 0.5.0 has known communication issues (mitigated by retry + verification)
|
||||
- INFO: Plan 03-02 will integrate OverlayService and implement staleness UI feedback
|
||||
- INFO: Manual testing needed after 03-02 to verify overlay reliability improvements
|
||||
- INFO: Manual testing needed to verify overlay reliability improvements on physical device
|
||||
- INFO: All OVRL-01 through OVRL-06 requirements satisfied
|
||||
|
||||
**Phase 4 (GPS Optimization):**
|
||||
- Speed thresholds (8/12 km/h) need field testing validation
|
||||
@@ -120,7 +131,7 @@ Recent decisions affecting current work:
|
||||
|
||||
## Session Continuity
|
||||
|
||||
Last session: 2026-02-11 (Plan 03-01 execution complete)
|
||||
Stopped at: Completed 03-01-PLAN.md — Phase 3 Plan 1 complete
|
||||
Last session: 2026-02-11 (Plan 03-02 execution complete)
|
||||
Stopped at: Completed 03-02-PLAN.md — Phase 3 complete
|
||||
Resume file: None
|
||||
Next action: Execute 03-02-PLAN.md (Overlay integration)
|
||||
Next action: Begin Phase 4 (GPS Optimization) planning
|
||||
|
||||